Apr 18 · 2026
Second-floor walls up
The east wall of the master suite went up this week. Window cuts framed for the jungle view.
Salvaje is going up on the jungle side of Lo de Marcos, Nayarit, opening late 2026. These are the notes from the build: what went up this week, who's building it, and what it's becoming.
The east wall of the master suite went up this week. Window cuts framed for the jungle view.
Local masons started laying the stone perimeter wall — hand set, river stone from up the valley.
Foundations poured, ground floor frames standing. Cactus and palm planting plan finalized with the landscaper.